Finishing plaster fragments extracted on 06/13/202 from:
Hillside Theater stage:
- High ceiling
- South wall
- North wall
- Lower ceiling
- Piano niche
- Lighting catwalk
- Foyer
- Bathroom wall
- Fireplace area
Location
![](https://acl.design.upenn.edu/wp-content/uploads/2023/04/Thesis_bins.jpg)
Finishing plaster fragments extracted on 06/13/202 from:
Hillside Theater stage: